← 返回上一级 ID: 3166

URL: https://www.sbmchina.com/media/articals/crushed-stone-and-gravel-building-a-strong-foundation.html

AI 检查建议:

【第 1 段建议】: 1. "Vertical Shaft lmpact Crusher" - "lmpact" 应为 "Impact"。 2. "SMP Crushing Plant" - "SMP" 应为 "SMP" ,可能需要确认是否为正确缩写。 3. "High Weir Spiral Classifier" - 多余的空格,应为 "High Weir Spiral Classifier"。 4. "Submerged Spiral Classifier" - 多余的空格,应为 "Submerged Spiral Classifier"。 5. "Aggregates Belt Conveyor" - 应改为 "Aggregates Belt Conveyors",以保持一致的复数形式。 6. "Track Bulk Reception Feeder" - 应改为 "Tracked Bulk Reception Feeders",以保持一致的复数形式。 7. "Wheeled Bulk Reception Feeder" - 应改为 "Wheeled Bulk Reception Feeders",以保持一致的复数形式。 8. "Radial Telescopic Stacker" - 应改为 "Radial Telescopic Stackers",以保持一致的复数形式。 以上是我的发现。 --- 【第 2 段建议】: 1. "Building a Strong Foundation: How Crushed Stone and Gravel Can Help" - 需要在标题的冒号后面添加一个空格。 2. "Building a strong foundation requires the use of high quality and durable base materials" - 应为"high-quality"(加连字符)。 3. "•" - 应为"•"需要在文本中显示为一个项目符号,而不是在文本中直接书写。 4. "compressive strength and prevents the base from dispersing under load." - 在此句中应考虑是否需要使用复数“bases”或保持为“the base”视具体情况而定。 5. "Site Preparation Before laying the foundation" - 需要在“Site Preparation”和“Before”之间加大写字母的空格或标点符号(例如,句号)。 6. "any vegetation or debris, grading the site to ensure proper drainage," - 建议在“drainage”之后加上句号以结束所有句子。
标记为已完成修改